HCC Pension Fund, Bedford Row

Client: HCCPension Fund
Value: £1.1m
Contract Period: 20 Weeks
Form of Contract: JCTIntermediate
Architect: OrbitArchitects
QuantitySurveyor: WilliamG Dick Partnership
Services Engineer: The Engineering Practice

Fit out works to CAT A standard were undertaken to 4 floors of this 7 storey building, whilst 3 floors remained occupied and fully functional.

Project details:-

  • The installation of plasterboard raft ceiling, including suspended light fittings, low lever perimeter air conditioning units and raised access flooring.
  • The entrance hall was also refurbished to include new stone flooring and timber panelling.
  • All toilet areas were fully refurbished with individual “superloos”.
  • External works incorporated in a new fire escape formed in steelwork and new piled foundations.