South East Essex College, Southend

Client: SouthEast Essex College
Value: £0.435m
Contract Period: 10 Weeks
Form of Contract: JCT D&B (2 Stage)
Architect: Gibberd
Quantity Surveyor: Castons
Services Engineer: Stuart McCurry & Partners

Southend Campus was opened in 2004, Apex were appointed to refresh the original  atrium  space  in  order  to  provide  break  out  space,  fully  functional stationers/newsagent and travel shop and cafe, all run by the students  as part of their education and training.

Project Details:-

  • Refurbishment of part atrium area including  the formation of a break out area using freestanding structural glass walling.
  • Providing a fully functional cafe area including the installation of industrial kitchen equipment for catering training.
  • Forming an area for travel agent sales and training.
  • Creation of stationers/newsagent  incorporating shopfitting,  glass and tiled walls.