Client: SouthEast Essex College
Value: £0.435m
Contract Period: 10 Weeks
Form of Contract: JCT D&B (2 Stage)
Architect: Gibberd
Quantity Surveyor: Castons
Services Engineer: Stuart McCurry & Partners
Southend Campus was opened in 2004, Apex were appointed to refresh the original atrium space in order to provide break out space, fully functional stationers/newsagent and travel shop and cafe, all run by the students as part of their education and training.
Project Details:-
- Refurbishment of part atrium area including the formation of a break out area using freestanding structural glass walling.
- Providing a fully functional cafe area including the installation of industrial kitchen equipment for catering training.
- Forming an area for travel agent sales and training.
- Creation of stationers/newsagent incorporating shopfitting, glass and tiled walls.